http://hdl.handle.net/123456789/7358
Title: | FACTORS AFFECTING PERFORMANCE OF BUILDING CONSTRUCTION PROJECTS AT LIDETA SUB-CITY: THE CASE OF COMMERCIAL BUILDING PROJECTS |
Authors: | GEBREHEWOT, MAEREGE |
Keywords: | project cost management factors, project time management factors, project quality management factors, project scope management factors, project risk management factors, project performance indicators, Lideta sub-city, Ethiopia. |
Issue Date: | May-2019 |
Publisher: | ST. MARY’S UNIVERSITY |
Abstract: | The purpose of this study is to examine the factors affecting the performance of commercial building projects at Lideta Sub-city. More specifically, the study aims to identify and describe the relationship between project cost management factors, project time management factors, project quality management factors, project scope management factors, project risk management factors and performance indicators of commercial building construction projects at Lideta Sub-city. The study employed a causal research design and used a quantitative research approach. A survey was conducted by using 174 structured close ended questions which were distributed to 58 contractors, 58 consultants and 58 owners of building construction projects. Descriptive and multiple regression statistical tools were used to examine the causal relationship between factors that affect project performance and project performance indicators (construction cost, construction time, construction quality and construction scope). The findings of the regression analysis showed that project cost management factors, project time management factors, project quality management factors, project scope management factors and project risk management factors are positively and significantly affected performances of building construction projects at Lideta Sub-city. Thus, this study recommended that contractors, consultants and owners should really give emphasis on addressing the correlates of project performances so as to increase the efficiency, effectiveness and quality of building construction projects at the Sub-city. |
URI: | . http://hdl.handle.net/123456789/7358 |
Appears in Collections: | Project Management |
File | Description | Size | Format | |
---|---|---|---|---|
AFTER COMMENT.pdf | 1.55 MB | Adobe PDF | View/Open |
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.