Skip navigation
st. Mary's University Institutional Repository St. Mary's University Institutional Repository

Please use this identifier to cite or link to this item: http://hdl.handle.net/123456789/6959
Full metadata record
DC FieldValueLanguage
dc.contributor.authorGUDETA, MERON-
dc.date.accessioned2022-04-29T12:52:59Z-
dc.date.available2022-04-29T12:52:59Z-
dc.date.issued2021-12-
dc.identifier.uri.-
dc.identifier.urihttp://hdl.handle.net/123456789/6959-
dc.description.abstractProject failure is largely attributed to the poor material management that can result in to poor quality materials, damage to material, poor planning, late deliveries and high costs. Therefore, to prevent project failure proper material management is vital for construction industry. The main aim of this research paper is to examine construction materials management practice and perceived project performance: the case of Yotek construction plc. in focus. A questionnaire survey administered to a purposive selected sample of 60 persons which include contractors, warehouse managers, construction managers, consultant engineers, and site supervisors, eliciting current material management practices through open-ended questions along with questionnaires to obtain important data for the study. However, 40 questionnaires were received properly. The relationship between different material management practices and project performance in terms of cost overrun, abundance of materials waste, material management system and delay were acquired from this questionnaire. The findings indicated that there is a direct relationship between material management practices and project performance as of the improper material management practices lessen the performance of project. The study recommends that systematic approach is needed to manage materials, minimize costs and effects associated with inadequate materials management.en_US
dc.language.isoenen_US
dc.publisherST. MARY’S UNIVERSITYen_US
dc.subjectConstruction project, Material management, Yotek Construction PLCen_US
dc.titleCONSTRUCTION MATERIALS MANAGEMENT PRACTICE AND PERCEIVED PROJECT PERFORMANCE: THE CASE OF YOTEK CONSTRUCTION PLC.en_US
dc.typeThesisen_US
Appears in Collections:Project Management

Files in This Item:
File Description SizeFormat 
Meron Gudeta FINAL SUBMITTED THESIS (1).pdf710.49 kBAdobe PDFView/Open
Show simple item record


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.