Skip navigation
st. Mary's University Institutional Repository St. Mary's University Institutional Repository

Please use this identifier to cite or link to this item: http://hdl.handle.net/123456789/5768
Full metadata record
DC FieldValueLanguage
dc.contributor.authorSHIFERAW, ABEBE-
dc.date.accessioned2021-05-11T06:47:54Z-
dc.date.accessioned2021-05-11T06:47:55Z-
dc.date.available2021-05-11T06:47:54Z-
dc.date.available2021-05-11T06:47:55Z-
dc.date.issued2020-08-
dc.identifier.uri.-
dc.identifier.urihttp://hdl.handle.net/123456789/5768-
dc.description.abstractThe purpose of this study is to determine the effectiveness of Project Management Practices of IFRS implementation Project in the case of Public enterprises in Ethiopia. In this study, descriptive design and quantitative research through structured questionnaires, and a semi-structured interview designed for qualitative research have been used. A Project management Body of Knowledge (PMBoK), a critical success factors obtained through implementation and the way the process groups operated are used as a variable. The data collection methods were a questionnaire and semi-structured interview with review of relevant documents. The data collected from the questionnaire was analyzed using descriptive analyses with SPSS 21 and the interview was qualitatively interpreted. The result from the study revealed that Public enterprises have practiced a project management during their IFRS implementation processes led by different teams and steering committee without a project manager. Getting the primary all-inclusive sensitivity of the concerning body were one of the major critical success factors and the load thrown on the finance department to coordinating responsibility is one of the challenge they faced. So that, the same support and follow up from concerning bodies for future implementers has recommended. And finally, possible research areas that investigators shall use for the future following this result as a paving a way has showed.en_US
dc.language.isoenen_US
dc.publisherST. MARY’S UNIVERSITYen_US
dc.subjectProject, Project Management, Project Management Practices, IFRS implementation, Public Enterpriseen_US
dc.titleTHE EFFECTIVENESS OF PROJECT MANAGEMENT PRACTICES OF INTERNATIONAL FINANCIAL REPORTING STANDARDS (IFRS) IMPLEMENTATION PROJECT IN PUBLIC ENTERPRISES IN ETHIOPIA:en_US
dc.typeThesisen_US
Appears in Collections:Project Management
Project Management

Files in This Item:
File Description SizeFormat 
Abebe Shiferaw.pdf1.91 MBAdobe PDFView/Open
Show simple item record


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.