DC Field | Value | Language |
dc.contributor.author | ZERAY, SEYOUM | - |
dc.date.accessioned | 2019-11-18T11:35:47Z | - |
dc.date.available | 2019-11-18T11:35:47Z | - |
dc.date.issued | 2019-06 | - |
dc.identifier.uri | . | - |
dc.identifier.uri | http://hdl.handle.net/123456789/4954 | - |
dc.description.abstract | Labor productivity is one measure of the efficiency with which the human labor is assessed. Any
variations in labor productivity will affect the construction project. A decline in productivity
causes an increase in the time necessary to complete the project and the total cost of the
project. The main objective of this study was to assess the influence of design and specification
related factors, technological related factors, labor related factors, and organizational related
factors on labor productivity in construction building projects in Defense Construction
Enterprise as a case study. The research was primarily based on primary data collected through
a structured questionnaire. To this respect, a total of 114 questionnaires were distributed to
purposively selected employee of defense construction enterprise, which constituted response
rate of (77) or 68% and this was adequate for statistical generalization of the study findings.
The information was displayed by use of charts and tables. Major design and specification
related factors that affect labor productivity at projects are delay in preparation and delivery of
drawings, incomplete and inaccurate drawings, and design changes at building projects. Major
construction technological related factors that affect labor productivity at projects are lack of
construction equipment and tools, an absence of technological advancements for machineries,
and frequent damage of equipment. Major labor related factor that affects labor productivity at
projects is incompetence of labors at projects. Major organizational related factors that affect
labor productivity at projects were cash flow and financial difficulties, poor resources
management, absence of working plan, lack of employee motivation, and poor communication in
the enterprise. The researcher further employed a multiple linear regression model to analyze
the relationship between factors affecting labor productivity and level of labor productivity in
building projects. The regression result reveals technological and organizational related factors
are positively and significantly influence the labor productivity. On other hand, labor and design
and specification related factors were found positive but not significant factor influencing the
productivity of labor. The results of the study may suggest that the enterprise need to give more
emphasis on technological and organizational related factors to enhance labor productivity in
building projects. | en_US |
dc.language.iso | en | en_US |
dc.publisher | st.mary's University | en_US |
dc.subject | Project, Labor Productivity, | en_US |
dc.subject | Construction Industry, Ethiopia | en_US |
dc.title | FACTORS AFFECTING EMPLOYEE PRODUCTIVITY IN CONSTRUCTION SECTOR: THE CASE OF DEFENSE CONSTRUCTION ENTERPRISE | en_US |
dc.type | Thesis | en_US |
Appears in Collections: | GENERAL MANAGEMENT
|