Please use this identifier to cite or link to this item: http://hdl.handle.net/123456789/2708
Full metadata record
DC FieldValueLanguage
dc.contributor.authorTAYE, MERID-
dc.date.accessioned2017-01-06T09:36:00Z-
dc.date.available2017-01-06T09:36:00Z-
dc.date.issued2016-09-
dc.identifier.urihttp://hdl.handle.net/123456789/2708-
dc.description.abstractIn DCE the number of construction projects is increasing from time to time. However, it becomes difficult to complete projects in the allocated cost and time. Taking this into consideration, time and cost overruns is one of the major problems in the construction proje cts. Therefore, this research i s carried out to make assessment on the factors that cause time and cost overruns of construction projects, their effects and resolutions. Questionnaire survey together with desk study was used to collect data on time and cost overruns . Desk studies of 10 completed construction projects were investigated, and from the analysis it was found that 100% of the construction projects suffered by both time and cost overruns. The rate of time overrun ranges from a minimum of 13 % to the maximum of 181 % of the contract time , and cost overrun ranges from a minimum of 1% to the maximum of 4 7 % of the contract amount. A total of 48 questionnaires were distributed and collected from DCE managers, team leaders and experts. From the analysis of the questionnaire response, th e top main significant causes of time and cost overrun s are less emphasis to planning (MS: 2.92), poor contract management (MS: 2.88) and p oor pre planning process (MS: 2.88) . The top ranked effects of time and cost overruns identified by this research are the contribution of the construction industry to the growth of national economy of the country will be less (MS: 2.75), delayed payments to contractor (MS: 2.75) and inability to deliver value for money (MS: 2.67) .The top ranked resolution methods recognized by the respondents are timely progress control, schedule control, c ost control, resource control by comparing with the completion date and cost (MS: 3.33), a ssign competent personnel (MS: 3.13) and effective strategic planning (MS: 3.00) . Finally, the study recommended DCE to have committed leadership and management, timely decision process, advanced contract and project management, systematic control mechanism and effective and efficient strategic planning and management.en_US
dc.language.isoenen_US
dc.publisherSt. Mary's Universityen_US
dc.subjectTime Overrunen_US
dc.subjectCost Overrunen_US
dc.subjectCauseen_US
dc.subjectResolutionen_US
dc.subjectEffecten_US
dc.subjectBusiness Administrationen_US
dc.titleAssessment of Time and Cost Overruns in Construction Projects (Case Study at Defense Construction Enterprise)en_US
dc.typeThesisen_US
Appears in Collections:Business Administration

Files in This Item:
File Description SizeFormat 
MS 100 PROJECT REPORT.pdf898.56 kBAdobe PDFView/Open
Show simple item record


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.